feat: Complete overhaul of FourSat documentation structure and content

- Added FINAL-STATUS.md detailing project completion and key metrics
- Created QUICK-REFERENCE.md for quick access to essential documents
- Updated README.md with project overview and quick start guide
- Established STRUCTURE.md outlining the final documentation structure
- Organized and archived old files, ensuring a clean and efficient directory
- Enhanced documentation quality with comprehensive metrics and checklists
This commit is contained in:
masoodafar-web
2025-12-04 17:32:31 +03:30
commit 119e870a26
67 changed files with 210873 additions and 0 deletions
+203
View File
@@ -0,0 +1,203 @@
# 🎯 اسپرینت جاری (Current Sprint)
**تاریخ شروع**: ۱۴ آذر ۱۴۰۴
**مدت**: 2 هفته
**هدف**: تکمیل FrontOffice UI و یکپارچه‌سازی BFF
---
## 📋 وضعیت کلی پروژه
### Backend:
-**CMS Microservice**: 95% Complete (Phase 9 & 12 Complete)
-**BackOffice.BFF**: 100% Complete (35 Handlers)
- 🚧 **FrontOffice.BFF**: 60% Complete (12 Handlers - 3 new today)
### Frontend:
-**BackOffice UI**: 100% Complete (23 Pages)
- 🚧 **FrontOffice UI**: 75% Complete (24 Pages - 7 new today)
---
## 🔥 High Priority (باید امروز/فردا تمام شود)
### 1. FrontOffice UI - Integration با BFF Real APIs ⏰
**Status**: 🚧 In Progress (Mock → Real API)
**Owner**: Frontend Team
**Deadline**: ۱۵ آذر (فردا)
#### Tasks:
- [ ] **ClubMembership صفحات** (3 صفحه)
- [ ] `ClubInfo.razor` - اتصال به `GetClubMembershipInfo`
- [ ] `ActivateClub.razor` - اتصال به `ActivateClubMembership`
- [ ] `ClubFeatures.razor` - اتصال به `GetAvailableClubFeatures`
- [ ] **NetworkMembership صفحات** (2 صفحه)
- [ ] `Tree.razor` - اتصال به `GetNetworkTree` + Tree Builder
- [ ] `NetworkStats.razor` - اتصال به `GetNetworkStatistics`
- [ ] **Commission صفحات** (2 صفحه)
- [ ] `WeeklyReport.razor` - اتصال به `GetWeeklyCommissionReport`
- [ ] `PayoutHistory.razor` - اتصال به `GetUserPayouts`
**Blockers**:
- ⚠️ Protobuf mismatch (ActivationDate vs ActivatedAt) - نیاز به هماهنگی با Backend
- ⚠️ Tree structure در CMS flat list است - نیاز به Tree Builder در BFF
---
### 2. FrontOffice.BFF - رفع Protobuf Mismatches ⏰
**Status**: 🚧 In Progress
**Owner**: Backend Team
**Deadline**: ۱۵ آذر
#### Tasks:
- [ ] **ClubMembershipHandler** - تطبیق field names
```csharp
// CMS: ActivationDate → BFF: ActivatedAt
// FIX: Rename in proto or add mapping
```
- [ ] **NetworkMembershipHandler** - پیاده‌سازی Tree Builder
```csharp
// CMS: Flat list → BFF: Tree structure
// FIX: Build tree from flat list recursively
```
- [ ] **CommissionHandler** - تطبیق WeekNumber type
```csharp
// CMS: WeekNumber (int) → BFF: WeekNumber (string)
// FIX: Convert int to "YYYY-Www" format
```
**File**: `03-BACKEND/FrontOffice.BFF/protobuf-mismatch.md` دارای جزئیات کامل
---
## 🟡 Medium Priority (این هفته)
### 3. WalletService - پیاده‌سازی متدهای TODO
**Status**: ⏳ Not Started
**Owner**: Frontend Team
**Deadline**: ۱۷ آذر
#### Tasks (5 متد):
- [ ] `GetUserWalletBalanceAsync()` - دریافت موجودی کیف پول
- [ ] `ChargeWalletAsync()` - شارژ کیف پول
- [ ] `WithdrawFromWalletAsync()` - برداشت از کیف پول
- [ ] `GetWalletTransactionsAsync()` - تاریخچه تراکنش‌ها
- [ ] `TransferBetweenWalletsAsync()` - انتقال بین کیف پول‌ها
**File**: `04-FRONTEND/FrontOffice/todo-commented-code.md`
---
### 4. Package Purchase System - UI Implementation
**Status**: ⏳ Not Started (Proto Complete ✅)
**Owner**: FrontOffice Team
**Deadline**: ۱۸ آذر
#### CMS Status:
- ✅ Entities (5) - `PackagePurchase`, `PackagePurchaseItem`, etc.
- ✅ Commands (6) - `CreatePackagePurchaseCommand`, etc.
- ✅ Queries (3) - `GetPackagePurchaseByIdQuery`, etc.
- ✅ Protobuf (4 RPCs) - 264 lines
#### Pending:
- [ ] BFF Handlers (3 modules)
- [ ] UI Pages (4 صفحه)
- [ ] `Packages.razor` - لیست پکیج‌ها
- [ ] `PurchasePackage.razor` - خرید پکیج
- [ ] `MyPackages.razor` - پکیج‌های من
- [ ] `PackageDetails.razor` - جزئیات پکیج
**Reference**: `01-BUSINESS/package-purchase-system.md`
---
## 🟢 Low Priority (هفته بعد)
### 5. VAT System Implementation
**Status**: ⏳ Not Started
**Owner**: CMS Team
**Estimate**: 2 روز
#### Requirements:
- پیاده‌سازی محاسبه مالیات بر ارزش افزوده (VAT)
- اضافه شدن به Invoice ها
- تنظیمات پویا برای درصد VAT
---
### 6. RBAC System Implementation
**Status**: ⏳ Not Started
**Owner**: CMS + BFF Teams
**Estimate**: 1.5 هفته
#### Requirements:
- تعریف Roles و Permissions
- Policy-based Authorization
- Admin Panel برای مدیریت دسترسی‌ها
---
## ⚠️ Blockers & Dependencies
### 🔴 Critical Blockers:
1. **Protobuf Mismatch** (FrontOffice.BFF ↔ CMS)
- Impact: 3 modules affected
- Resolution: Backend coordination needed
- ETA: امروز/فردا
2. **Tree Builder Missing** (NetworkMembership)
- Impact: Tree.razor can't display network
- Resolution: Implement recursive tree builder in BFF
- ETA: 1 روز
### 🟡 Minor Issues:
1. **WalletService Mock Data** - نیاز به پاکسازی بعد از اتصال API
2. **MudBlazor Warnings** - 113 warning (غیر critical)
---
## 📊 Velocity Tracking
### کارهای تمام شده امروز (۱۴ آذر):
- ✅ FrontOffice UI: 7 صفحه جدید (Club, Network, Commission)
- ✅ FrontOffice.BFF: 3 CQ module جدید
- ✅ Build Successful: 0 errors
- ✅ Documentation: 2 فایل تحلیل جدید
### تخمین باقیمانده:
- **FrontOffice UI Integration**: 2 روز (7 صفحه × 3-4 ساعت)
- **Protobuf Fixes**: 1 روز (3 handler)
- **WalletService Implementation**: 1 روز (5 متد)
- **Package Purchase UI**: 2 روز (4 صفحه + BFF)
**Total**: ~6 روز کاری (1.5 هفته)
---
## 🎯 Definition of Done
### برای هر Task:
- [ ] Code Review Complete
- [ ] Build با 0 error
- [ ] Manual Testing انجام شده
- [ ] Documentation بروز شده
- [ ] Merged به `develop` branch
---
## 📝 Daily Standup Notes
### ۱۴ آذر ۱۴۰۴:
- **Yesterday**: FrontOffice analysis & UI skeleton
- **Today**: 7 new pages + 3 BFF modules + Mock services
- **Blockers**: Protobuf mismatch discovered
- **Next**: Real API integration tomorrow
---
**منتظر بروزرسانی روزانه هستیم** 🚀