Docs: Phase 8b-8d — BO CRUD expansion + FO Customer RPCs + Proto cleanup
- PACKAGE-TRANSFORMATION-TASKS.md: Add phases 8b, 8c, 8d with full details
Updated overview diagram, commit hashes, status to 0-8d complete
- OVERVIEW-03-CHANGELOG.md: Add Phase 8b (BO CRUD) + Phase 8a+8c (FO)
Updated summary table to 99% (240/241 complete)
|
2026-02-26 18:04:04 +03:30 |
|
masoodafar-web
|
a61a987b57
|
docs: Add Phase 8a — Checkout wire-up + NuGet plan
|
2026-02-26 03:36:33 +03:30 |
|
masoodafar-web
|
d94b09878a
|
docs: Update TASKS for Phase 7a-c completion (16 commits across 3 repos)
- Phase 7a: Cosmetic cleanup (CMS+FO+BO)
- Phase 7b: FrontOffice RPC migration to Customer* RPCs
- Phase 7c: Delete 4 deprecated CQRS handlers (1125 lines removed)
- Updated overview diagram, commit list, and footer
|
2026-02-26 03:06:22 +03:30 |
|
masoodafar-web
|
0aa126af1c
|
Docs: Phase 5-6 completion — per-package commission + deprecation cleanup
- CHANGELOG: Phase 5 (per-pkg commission, golden cleanup) + Phase 6 (deprecation, ConfigService MagicWallet)
- ROADMAP: Progress 83%→93%, timeline updated through Phase 6
- TASKS: Mark مرحله ۳ (پورسانت) ✅, add commits 607f791→7176fe4→d19c569
|
2026-02-26 01:14:51 +03:30 |
|
masoodafar-web
|
37330a3e45
|
docs: update all documentation for Package-Based Transformation Phase 0-4
- OVERVIEW-03-CHANGELOG: Add complete Package-Based section (Phase 0-4) with
commit references, add summary table row, update timeline
- OVERVIEW-05-ROADMAP: Add Package-Based progress bar (83%), update DONE/NOW
sections with Phase 0-4 complete and Phase 5-6 pending
- OVERVIEW-02-INDEX: Add 4 new roadmap files to index, update file counts
- BIZ-PACKAGE-BASED-SYSTEM: Status → 'در حال پیادهسازی — فاز 0-4 تکمیل'
with all 7 commit hashes
- PACKAGE-TRANSFORMATION-TASKS: Mark Phase 0/1/2 as complete with commit refs,
update overview diagram with completion markers
|
2026-02-26 00:32:33 +03:30 |
|
masoodafar-web
|
33d5ae9305
|
docs: BIZ-PACKAGE-BASED-SYSTEM v3 — per-package commission deep analysis
Major v3 changes:
- Q12-Q18: MaxWeeklyBalancesPerLeg, MaxNetworkLevel, MagicWalletMaxDeposit,
MagicWalletMaxCredit all become per-package (not global SystemConstants)
- NetworkWeeklyBalance gets PackageId + Unique(UserId,WeekId,PackageId)
- SP changes: @MaxBalancesPerLeg and @MaxNetworkLevel as dynamic params
(removing hardcoded 300/15)
- SpCommissionCalculationStrategy: pass package settings to SPs
- Carryover per-package: week-shifting only for same PackageId records
- commission.proto: package_id+package_title in 4 message types,
new CustomerCommissionPackageSummary message, package filter in requests
- FrontOffice: commission dashboard with per-package summary cards
- BackOffice: package filter dropdown in all commission reports + CSV
- Package Create/Edit: Quick Access checkboxes for features inline
- Seed data: silver MaxBalancesPerLeg=30, MagicWalletMax=100M/250M
- Migration: NetworkWeeklyBalances existing records get base PackageId
- Impact Analysis: 39 -> 48+ changes across 6 layers
- Timeline: 14 -> 17 days critical path (+3 days for per-package work)
Updated docs:
- business/BIZ-PACKAGE-BASED-SYSTEM.md (v2 -> v3)
- roadmap/PACKAGE-TRANSFORMATION-TASKS.md (synced with v3)
|
2026-02-24 23:48:09 +03:30 |
|
masoodafar-web
|
01244f426e
|
docs: package-based transformation — complete roadmap + UX impact + feature backlog
New documents:
- roadmap/FEATURE-BACKLOG.md: 12 kept RPCs → feature tasks with priority,
target pages, and time estimates (F1-F12)
- roadmap/PACKAGE-TRANSFORMATION-UX.md: UX impact analysis —
before/after wireframes for 19 pages (10 FO + 9 BO),
customer + admin experience changes, future needs prediction
- roadmap/PACKAGE-TRANSFORMATION-TASKS.md: step-by-step implementation
plan (6 phases, ~13 day critical path), atomic tasks with
code diffs, dependency graph, test checklist
Updated:
- cms/GRPC-SERVICES-AUDIT.md: cross-references to new docs
Total: 998 lines of documentation covering:
- 12 RPC feature tasks prioritized by package-based relevance
- 19 page wireframes (before/after comparison)
- 39 transformation tasks broken into 6 phases
- 10 predicted future requirements (N1-N10)
- Risk analysis + rollback plan + calendar
|